Installation of two 2,700t arcs for the Toruń Bridge, Poland

By Bizclik Editor

ALE was contracted to complete the skidding, assembly and float installation of two 2,700t arches over the 500m wide river Vista, in Toruń which will become a traffic bridge and is a major investment in the region. Case study http://www.ale-heavylift.com/case-study/installation-two-2700t-bridge-arches-torun-poland/

Share

Featured Videos

View all
Featured

HPE Digital Transformation Keynote at P&SC LIVE Singapore

Veena Theagarajan, Senior Director of Digital Transformation at HPE, discusses digital transformation in the supply chain

Technology

P&SC LIVE Singapore – The Transformation Forum

Technology

P&SC LIVE Singapore – Geodis’ CPO Keynote

Digital Supply Chain

P&SC LIVE Dubai (Virtual): Everything You Need to Know